Main Index

45 Gallon Drum

Next Page

by Aldo R. Pando

The first part I made was the bottom oscillator. Refer to drawing #45GD-11 for details. Picture one shows the pop can bottoms I filled with cement. The next drum device I do I'll mix cement with sand at a ratio of 50/50. I discovered later that this is necessary because the cement is now broken and leaking powder. Refer to drawing #45GD-02.

The next three pictures show the ¼" plywood triangles I cut using a numeric control cutting(NCC)machine, three steel 1" ball bearings I bought from a car parts shop and two donut shaped magnets that lie in the center of the triangle (in attraction to provide the centering force). I cut 4 plywood triangles and then glued two sets together. Refer to drawings #45GD-01 and #45GD-12.




Main Index Next Page